News

Traffic changes due to Danube flooding

arviz

The sections of the lower Pest embankment between Lánchíd (Chain Bridge) and Közraktár utca as well as between Dráva utca and Jászai Mari tér are reopened from 22:00 on 17 June 2013, thus only the section between Jászai Mari tér and Lánchíd remains closed during the construction carried out at the underground car park of the Parliament.

Simultaneously with the reopening of the above sections, the temporary bus lane on Hegyalja út will be suspended and Frankel Leó utca will be reopened to traffic. On Budafoki út the section between Karinthy Frigyes út and Bertalan Lajos utca in the direction of the city centre will be open only to public transport vehicles from 18 June 2013 due to construction however in the outer direction, as before, there are no restrictions. However we recommend motorists avoid this section also in the outer direction. Restrictions on the other parts of Budafoki út will be suspended.

Last update: 20 June 2013 16:08

map

 

Tram 2

2

As the damage assessment of the tram underpasses is still ongoing, restrictions still apply on the affected sections of the route of tram 2.

Margitsziget

4 6
26

Margitsziget will be partially reopened on Saturday, 22 June 2013 as follows:
From the first departure to  8:45 and from 20:30 to the last departure bus 26 will run on a shortened route between Árpád híd M and Zenélőkút.  From 8:45 to 20:30 the bus will run on its original route skipping certain stops.
From the first departure to  8:45 and from 20:30 to the last departure bus 234 coming from Békásmegyer, Újmegyeri tér will run on a shortened route between the Békásmegyer, Újmegyeri tér and Zenélőkút stops. Coming from Nyugati pályaudvar the diverted route is via Nyugati tér – Váci út – Róbert Károly körút. From 8:45 to 20:30 the bus will run on its original route skipping certain stops.

Királyok útja, Nánási út

34
934

At 12:00 noon on 20 July 2013 Királyok útja was reopened to traffic, thus buses 34 and 934 run on their original routes again.

Lower embankments

The sections of the lower Pest embankment between Lánchíd (Chain Bridge) and Közraktár utca as well as between Dráva utca and Jászai Mari tér are reopened from 22:00 on 17 June 2013, thus only the section between Jászai Mari tér and Lánchíd remains closed during the construction carried out at the underground car park of the Parliament.

Other restrictions

  • From Friday, 21 June 2013 boat lines D11, D12 and D13 will resume their regular services from their first departures, however boat line D13 will not serve the Margitsziget, szállodák and Margitsziget, Centenáriumi emlékmű piers.
  • Also from their first departures on Friday, 21 June 2013 buses 122, 104, 104A, 196 and 204 will serve the stop at Újpest, Árpád út pier again.
  •  

This entry was posted in News. Bookmark the permalink.
Email This PostAdd to favourites Print

Comments are closed.